4th May 2015
SPS supplied over 200 number 1.5te large Mulitflex Sand Bags to VolkerStevin.
All bags were installed using SPS multi installation lifting equipment to be used as scour protection around wind turbines in the Wash of Kings Lynn.

4th May 2015
SPS supplied over 200 number 1.5te large Mulitflex Sand Bags to VolkerStevin.
All bags were installed using SPS multi installation lifting equipment to be used as scour protection around wind turbines in the Wash of Kings Lynn.