Doha Slipway
In 2009 SPS supplied over 129 precast concrete slabs, and 435 base sections for the Hamad International Airport in Doha.
The construction for a boat access slipway is in case of an emergency and need for quick evacuation.

In 2009 SPS supplied over 129 precast concrete slabs, and 435 base sections for the Hamad International Airport in Doha.
The construction for a boat access slipway is in case of an emergency and need for quick evacuation.
